Skip to content

HMI Panels

HMI Touch Panels Supplier

We supply HMI Touch Panels as operator interface and visualization hardware for OEM builds, MRO, and line-down replacement sourcing. Use this page to compare specifications, applications, compatibility notes, and quote details.

Overview

When a line is down or a panel is being built, HMI Touch Panels have to match the installed base exactly. We quote against the specifics — ratings, interfaces, and mechanical fit — rather than a generic listing.

Sourcing and lead time

Typical availability runs stock to 5 weeks depending on the item and quantity. Stocked references ship quickly; larger or legacy requirements are scheduled and confirmed in the quote.

How to specify

Specify the installed part number, the operating voltage and environment, the required interface, and your volume. We confirm the match and prepare an RFQ-based quote.

At a glance
Display size15 in
Resolution1024x600
Touch typeProjected capacitive
Supply voltage24 V DC / 110 V AC
Communication portsUSB + Ethernet
Ingress ratingIP67
Mounting cutoutStandard DIN cutout
Operating temperature0 C to +50 C
ComplianceIEC 61131-2, UL 508
Lead timestock to 5 weeks

Representative values for selection guidance; exact specifications are confirmed per model in the quote. No price or stock claim is made.

Frequently asked questions

How do I confirm the right HMI Touch Panels for my system?
Send the existing model code or label photo, the panel voltage, and the interface in use. We verify fit against the specification and confirm before quoting.
What documentation comes with HMI Touch Panels?
Depending on the item, we provide test notes, cross-reference details, or retained original labeling on request so the part can be verified on receipt.
Are HMI Touch Panels new or refurbished?
Both are available depending on the item. Each quote states the condition — new, new old stock, refurbished and tested, or a compatible replacement — explicitly.
Can you supply HMI Touch Panels for a line-down situation?
Yes. Provide the part details and we prioritize availability; lead time for stocked references is typically the short end of stock to 5 weeks.

References