Skip to content

Industrial Communication Cables

Shielded Signal Cables Supplier

We supply Shielded Signal Cables as fieldbus and industrial-network cabling for OEM builds, MRO, and line-down replacement sourcing. Use this page to compare specifications, applications, compatibility notes, and quote details.

Overview

As part of the Industrial Communication Cables family, Shielded Signal Cables are supplied with the verification a maintenance or engineering team expects: confirmed ratings, correct interfaces, and protective packaging.

Sourcing and lead time

Typical availability runs stock to 3 weeks depending on the item and quantity. Stocked references ship quickly; larger or legacy requirements are scheduled and confirmed in the quote.

How to specify

Provide the controller or machine context, the electrical ratings, and the connector or protocol needed. We verify fit against the specification and quote to your quantity.

At a glance
ProtocolPROFINET
Conductor count5-core
Characteristic impedance120 ohm
ShieldingFoil + braid
Jacket materialPUR
Bend radius5x OD fixed
Cable length3 m
Operating temperature-40 C to +80 C
ComplianceIEC 61158, RoHS
Lead timestock to 3 weeks

Representative values for selection guidance; exact specifications are confirmed per model in the quote. No price or stock claim is made.

Frequently asked questions

Are Shielded Signal Cables new or refurbished?
Both are available depending on the item. Each quote states the condition — new, new old stock, refurbished and tested, or a compatible replacement — explicitly.
What documentation comes with Shielded Signal Cables?
Depending on the item, we provide test notes, cross-reference details, or retained original labeling on request so the part can be verified on receipt.
How do I confirm the right Shielded Signal Cables for my system?
Send the existing model code or label photo, the panel voltage, and the interface in use. We verify fit against the specification and confirm before quoting.
Can you supply Shielded Signal Cables for a line-down situation?
Yes. Provide the part details and we prioritize availability; lead time for stocked references is typically the short end of stock to 3 weeks.

References