Optoelectronics & Displays
High Brightness F3 Round Head Red Led Indicator Long Lead 3MM Low Power Through Hole Light Source

Sourcing High Brightness F3 Round Head Red Led Indicator Long Lead 3MM Low Power Through Hole Light Source? This optoelectronics & displays component is supplied through authorized channels with datasheet-verified specs. The headline rating is Pitch of 3MM. It is commonly specified for status indication and panel backlighting.
Overview
High Brightness F3 Round Head Red Led Indicator Long Lead 3MM Low Power Through Hole Light Source is selected when the design needs a Optoelectronics & Displays part with predictable, traceable performance. Each lot ships with date codes and, on request, a certificate of conformance.
Sourcing and lead time
We hold buffer stock on this reference and place factory orders for high volumes. Standard reel and tray multiples apply for production quantities.
Selection notes
For High Brightness F3 Round Head Red Led Indicator Long Lead 3MM Low Power Through Hole Light Source, the dominant trade-offs are rating margin, footprint, and cost at volume; we can map those against equivalents on request.
Typical application
In the field, High Brightness F3 Round Head Red Led Indicator Long Lead 3MM Low Power Through Hole Light Source is specified for status indication and panel backlighting; we can suggest equivalents within the same family if a cost-down or second source is needed.
| Pitch | 3MM |
|---|---|
| Termination | Press-fit |
| Mounting | Surface mount (SMD) |
| Operating range | -40 C to +100 C |
| Compliance | RoHS, IEC 62471 |
Figures reflect typical catalog values; confirm against the manufacturer datasheet for your lot.