Skip to content

Control Cabinet Components

Ferrules with Profibus Supplier

We supply Ferrules as panel-build and protection devices for OEM builds, MRO, and line-down replacement sourcing. Selection notes here center on Profibus signaling: wiring, shielding, termination, and integrity checks.

Overview

As part of the Control Cabinet Components family, Ferrules are supplied with the verification a maintenance or engineering team expects: confirmed ratings, correct interfaces, and protective packaging.

Profibus wiring notes

For Profibus links, the priorities are correct termination, shield handling, and conductor pairing. We supply Ferrules built for the protocol and can confirm pinout and grounding practice for your nodes.

Sourcing and lead time

Typical availability runs stock to 4 weeks depending on the item and quantity. Stocked references ship quickly; larger or legacy requirements are scheduled and confirmed in the quote.

How to specify

Provide the controller or machine context, the electrical ratings, and the connector or protocol needed. We verify fit against the specification and quote to your quantity.

At a glance
Rated currentSpecified per model
Rated voltage300/500 V
Poles/contacts2NO+2NC
MountingDIN rail (35 mm)
Connection typeScrew terminal
Breaking capacity6 kA
StandardIEC 60947-2
Operating temperature-25 C to +70 C
ComplianceIEC 60947, UL 508
Lead timestock to 4 weeks

Representative values for selection guidance; exact specifications are confirmed per model in the quote. No price or stock claim is made.

Frequently asked questions

Do these Ferrules support Profibus?
Yes — they are built for Profibus signaling. We can confirm pinout, shielding, and termination practice for your nodes.
Are Ferrules new or refurbished?
Both are available depending on the item. Each quote states the condition — new, new old stock, refurbished and tested, or a compatible replacement — explicitly.
Can you supply Ferrules for a line-down situation?
Yes. Provide the part details and we prioritize availability; lead time for stocked references is typically the short end of stock to 4 weeks.
How do I confirm the right Ferrules for my system?
Send the existing model code or label photo, the panel voltage, and the interface in use. We verify fit against the specification and confirm before quoting.

References